Free project-controls tool / 01
EAC Calculator
Turn cumulative earned-value inputs into an inspectable EAC/ETC estimate and a concise variance story.
Input sheet
Enter cumulative values
Use the same currency, reporting date, and control account scope for each value.
Authorized total budget for the scope.
$
Budgeted cost of work scheduled to date.
$
Budgeted cost of work performed to date.
$
Actual cost incurred to date.
$
Open commitments; shown as context, not used in formula.
$
Your forecast will appear here
Enter BAC, PV, EV, and AC to generate a transparent first-pass EAC estimate.
Tip: load the example to preview the result layout.